IIT Mandi Tenders


Dated Tender/EOI number Title Last date and time for receipt of Tender/EOI Date and time of opening of Tender/EOI is
2020-01-15 IITMANDI/S&P/PUR-378/2019-20/13344-45 SUPPLY, INSTALLATION & COMMISSIONING OF WIRELESS LAN CONTROLLER
Corrigendum:
18.02.2020 Till 11.00 AM 19.02.2020 At 11.00 AM
2020-01-15 IIT Mandi(CW)/SE-1086/2019-20/13270-72 dated 13-01-2020 Construction of toe wall and laying of paver blocks for OAT at LP-01 North campus of IIT Mandi and Providing and laying of paver blocks for parking, along A-08 auditorium Block and Providing and laying of paver blocks for lawn of A-05 Guest House Block at North Campus of IIT Mandi
Corrigendum:
23-01-2020 upto 03:00 P.M. 24-01-2020 at 03:30 P.M.
2020-01-15 IIT Mandi(CW)/SE-1065/2019-20/13346-48 dated 15-01-2020 Providing and laying Kota Stone and C.C flooring in Construction Material lab at North Campus of IIT Mandi.
Corrigendum:
22-01-2020 upto 03:00 P.M. 23-01-2020 at 03:30 P.M.
2020-01-14 . IIT Mandi(CW)/SE-1089/2019-20/ 13267-69 dated 13-01-2020 Construction of footpath along Navlay road from Canteen to OAT at South Campus of IIT Mandi.
03/02/2020 up to 03:00 PM 04/02/2020 at 03:30 PM
2020-01-14 IITMANDI/S&P/PUR-371/2019-20/13328-29 Power Electronics and Drives items
Corrigendum:
18.02.2020 Till 10:00 AM 19.02.2020 at 10:00 AM
2020-01-10 IIT Mandi(CW)/SE-1084/2019-20/13124-26 dated 09-01-2020 Re-painting of buildings at South campus of IIT Mandi.
Corrigendum:
23-01-2020 upto 03:00 PM 24-01-2020 at 03:30 PM
2020-01-09 No.IIT Mandi/OSD-1029/Hort./ 2019-20/13069-75 Dated: 08/01/2020 :- Providing and laying drip /sprinkler irrigation system (popup System) for village square Lawn at North Campus IIT Mandi(HP)
17/01/2020 upto 03:00 PM 17-01-2020 at 03:30 PM
2020-01-09 IITMANDI/S&P/PUR-370/2019-20/13119-13120 High Temperature Lift Bottom Furnace
Corrigendum:
30.01.2020 Till 11:00 AM
13.02.2020 Till 11:00 AM
31.01.2020 at 11:00 AM
14.02.2020 at 11:00 AM
2020-01-09 07/IIT Mandi(CW)/OSD-Civil/2019-20/13121-23 dated 09/01/2020 Construction of toe wall behind C-28 building at North campus of IIT Mandi(HP)
20/01/2020 upto 03:00 PM 21-01-2020 at 03:30 PM
2020-01-08 No.IIT Mandi/Hort./OSD-1029/2019-20/13054-59 Dated: 08 /01/ 2020 Horticulture development works near B-15 & B-24 Hostel Block and C-12 faculty Block at North Campus IIT Mandi(HP)
17-01-2020 upto 03:00 P.M. 17-01-2020 at 03:30 P.M.